SBN Production Release Glossary

SBN Production Release Glossary

==========================================

List of available samples

Production SBN 2022A (May, 2022)

Final production campaign to be launched for 2022 conference season; support ICARUS first neutrino data and ICARUS+SBND simulation, and SBND commissioning samples

Major updates in this release:

  • See list for SBN 2021C
  • Improved tuning of PMT reconstruction in ICARUS
  • Improved ICARUS TPC simulation
  • Added support for side and top panel CRT to ICARUS data reconstruction
  • Improved simulation speed and memory usage in the latest LArG4 release

Production SBN 2021C (December, 2021)

Main purpose: Test release for final production campaign to be launched for 2022 conference season

Major updates in this release:

  • Critical updates in Geant4 interfaces and charge/light simulation model and CRT simulation
  • Updates in ICARUS noise model and signal processing
  • New Beyond Standard Model physics simulation models
  • Tuning of high-level reconstruction and analysis interfaces