SBN Production Release Glossary
==========================================
Production SBN 2022A (May, 2022)
Final production campaign to be launched for 2022 conference season; support ICARUS first neutrino data and ICARUS+SBND simulation, and SBND commissioning samples
Major updates in this release:
- See list for SBN 2021C
- Improved tuning of PMT reconstruction in ICARUS
- Improved ICARUS TPC simulation
- Added support for side and top panel CRT to ICARUS data reconstruction
- Improved simulation speed and memory usage in the latest LArG4 release
Production SBN 2021C (December, 2021)
Main purpose: Test release for final production campaign to be launched for 2022 conference season
Major updates in this release:
- Critical updates in Geant4 interfaces and charge/light simulation model and CRT simulation
- Updates in ICARUS noise model and signal processing
- New Beyond Standard Model physics simulation models
- Tuning of high-level reconstruction and analysis interfaces